About fly KEWL

OPERATIONAL PHILOSOPHY

FACILITY HIGHLIGHTS

Expected runway capacity of over 150 arrival / departure operations per hour

Apron space designed for basing up to 30 total aircraft

Four (4) terminal cargo facilities with a total 800k sq ft. with direct landside truck docking access

Average over 3 million gallons of fuel pumped per year

Three (3) hangars for MRO operations

Planned FAA Air Traffic Control Tower with 24-7-365 Availability 

Two parallel runways

Current plans include jet and Avgas fuel farm with support trucks

Future plans include perishable processing facility 

RUNWAYS

Class IV airport

RWY 10L-28R   10,000 x 200 ft. with:

6 Highspeed Taxiway Exits

ILS CAT III approach

RWY 10R-28L   4,500 x 100 ft.

SMGCS taxi plan (in development)

ARFF Index E with 24-7-365 Availability 






Disclaimer

The information presented on these pages is purely fictitious and is intended to be included in as educational materials. Any resemblance to actual airport development plans is coincidence as this material is for learning purposes only and not to be copied, misconstrued, or taken out of context.